Forbidden to open the guards of the drum and belt, refit it after opening because of stoppage for some reason,When you open the cover to clean and maintain the cuttings dryer system , take note of protecting the nozzle of drum’s small end carefully, because the nozzle is made of hard alloy materials, it is hard and brittle, so jacking and hammering the nozzle is never allowed, and it is also forbidden to put any stick or fingers into the nozzle while the auxiliary motor is working. Even though the drum has stopped now, but the propeller is still working. Stick pulled in will damage the nozzle , and finger may be cut off,If shear pin is cut , replace it with a new one of the same specification and material. It is the best to use the shear pin provided by original manufacture. No other shear pins are. After using , flush and stop according to operational rules . Otherwise, drum or propeller may be jammed.
Make sure discharged solids can flow out of the tank smoothly, otherwise the gate may be blocked,pay attention to rigidity of the tank surface where centrifuge is mounted so as to avoid resonance,Check if main and auxiliary motor’s rotational direction is the same as arrows shows after resetting, no sand can be discharged if not.
Protect feed pipe carefully when removing and installing the centrifuge. Abrasion with the drum will occur when it is bent and it will be wear out at last,Six lunate discs are installed at the big end of the drum. Remount them back according to its series number after disconnecting, don’t exchange them so as to keep drum’s interia balance,No untrained personnel is permitted to operate the centrifuge.
1.Maintenance cuttings dryer .
There are four grease filling points in the centrifuge, two of them are at the top of the main bearing base. After every 8 hours’ running, fill No.2 lithium base grease in ,fill until excessive oil flow out. Another two filling point are at the left and right axle of the drum, fill 2# lithium base grease once every 50 hours (Each time, press grease gun for 10 times)
2.Lubricate the planetary gear box with No.68 engine oil. After the first 150 hours’ running , the engine oil should be replaced completely : First, drain off all the used oil , then fill in 4kg of diesel oil, screw the plug, and then discharge the diesel oil after manually rotating the differential several turns. In the same way, flush it for 2~3 times , finally, fill No.68 engine oil to the required level.
From now on, after every 1000 hours’ running , replace the oil according to the procedures described above .
3.No.20 or No.6 hydraulic transmission oil is normally used for filling into the hydraulic coupler . the oil in the coupler not only have the function of lubrication, but also as a media of transferring torque. The amount of oil feed directly affect the capacity of torque transmission. Max. oil feed shouldn’t exceed 80% of the total volume, otherwise coupler isn’t effective in buffering motor’s starting impact, then lead to pressure rising in the couple cavity while it is running, increase hydraulic loss, leakage and heat may occur; Min. oil feed can’t less than 50% of the total volume, otherwise, bearing can’t be fully lubricated, speed the wear of the bearing, at the same time, noise occur. replace the oil in the coupler after 3000 hours’ running . The oil filled must be filtrated by 80~100 strainer screen in order to keep debris out.
Category Archives: Uncategorized
operate the cuttings dryer system after long time off status
If we operate the cuttings dryer system after long time off status, we need to inspect motor rotary unit on insulation. Use 500V Ω gauge, get resistance is not larger than 0.5MSZ, we can run the shaker
Notice: ① If the motor doesn’t run at all, we must shut off the power immediately to avoid motor broken
② After starting motor, to inspect, whether this is any problem. If there is any break off or uncommon noise. If two motors are not running in-phase we need to stop the motors and get rid of problems then turn it on again for operation
③ When motor is under cold status, should not be started 5 times continuously; when motor is turned off under hot status, the restart can not be over 3 times continuously
Shaker screen maintenance
① Before every shut off, the shaker should run without any medium for 5-10 minutes, at the same time, use clean water to flush screen clean
② Every time finish operation, the shaker frame and screen should be flushed by water (summer) or steam (winter), there should be not much sediment on shaker frame and shaker screen. Especially when the drilling mud has large viscosity and high density or screen is finer than 60 mesh. Otherwise, the particles and fine sand on screen will block screen hole, when we start shale shaker, it will decrease filtration result and lead drilling mud flow away, lose much unnecessary cost.
cuttings dryer maintenance
Electric control cabinet is explosion proof magnetic starter, the electric principle is as fig VI, if there is any trouble we must shut off the power, and repaired by electrician or specific person
Spare parts for GNPS752
No. Name Model Unit Qty Remark
l Vibration motor MVE2400/15D Set 1 1.0kW
2 Vibration motor MVE1100/15D Set 1 0.4kW
3 Shaker screen 750×900mm PC 2 40/20目
4 Tension wedge PC 4
5 Spring PC 4
6 Damping horizontal strip PC 4
7 Damping vertical strip PC 4
8 Enclosed files for GNPS752
9 GNPS752 Shale shaker user manual 1 set
10 GNPS752 Quality certificate on shale shaker 1 set
Resource Box :
The author of the article recommends,if need pls contact us
Gnsolidsamerica company produces high cost shale shaker
This section contains a summary of WARNINGS. The ZCQ Degasser has been designed to perform the stated functions safely.
All persons responsible for operation and maintenance of this equipment must read and understand all safety information in this manual prior to operating and/or maintaining the equipment. The safety warnings listed below are included in applicable procedures throughout this manual.
This section describes the recommended installation procedure for the ZCQ270/360 Vacuum Degasser. Instructions include site preparation, equipment leveling, feed
and discharge connections, and electrical connections.
Gnsolidsamerica.com is the owner of the article on shale shaker screen and shale shaker , pls click gnsolidsamerica to know more info,pls visit us http://www.gnsolidsamerica.com/linear-motion-shale-shaker.html