Author Archives: dwastem

GN Dirt Weapon desander available

The actual GN dirt weapon is made for combining the actual drilling liquids and stop precipitation. Usually it will likely be coordinated along with dirt agitators. Solids dirt content material, for example barite as well as reduced the law of gravity exercise solids, may negotiate with time within regions of reduced liquid motion. The actual dirt weapon may be used like a precautionary imply in order to fight solids develop so that as something to lessen several hours allocated to container cleansing. In order to get rid of away resolved solids in order to prevent develop associated with barite within container edges.

GN provide 2 dimension dirt weapons. two in . dirt weapon as well as 3 in . dirt weapon. GN Dirt Weapons can be found along with 360 rotaion deals with, which help the actual swiveling important joints.

Options that come with GN Dirt Weapon desander:

Dirt Weapon desander

the. Nozzle

The cast replaceable put on proof polyurethane aircraft nozzle can be used, along with raise period so long as 2000 hr.

3 nozzle along with 120 in between one another. Just about all container part could be included in dirt weapon, actually with regard to set dirt weapon

w. Swiveling Realignment

The actual rotates tend to be fitted having a retractable manage. This enables with regard to realignment after which collapsing the actual manage to get rid of a visit risk.

GN Solids Manage may be the very first API licensed solids manage tools producer within The far east. to learn more in our dirt weapon. Make sure you contact us :.

desander-1

click here :  http://www.gnsolidsamerica.com/desander.html

drilling mud system of gn solids company

drilling mud system posted through Sophia Zhao. The actual Body shaker display are manufactured from steel. The actual cable fabric is actually rigidly bonded to some perforated steel solar panel that will extend the actual display existence. The actual body consists of regular co2 metal and also the nylon uppers consists of ss304 or even ss316 stainless materials.MI-Swaco Mongoose Shaker DisplayBecause MI-Swaco is really a well-known produce with regard to shale shaker produce, the actual display with regard to MI-Swaco may be well-liked. The actual remaining image is actually Mongoose shaker display as well as body kind.Sizing: Duration: 1165mm, Thickness: 585mm, Elevation: 40mm Coating: two, Display Materials: SS304 steel, Body materials: Co2 Metal. NOVEMBER Brandt Cobra Shaker DisplayNOVEMBER Brandt is really a well-liked produce with regard to essential oil drilling dirt digesting tools, certainly it s display already been popular globally.Sizing: Duration: 25inch, Thickness: 16inch, Elevation: 1inch Coating: two, Display materials SS304 steel, Body materials Co2 metalKEM-TRON KTL-48 shaker displayWith regard to KEM-TRON, its additionally a common produce with regard to dirt cleansing program focusing on essential oil drilling.Dimention: Duration 1220mm, thickness 710mm, Elevation 28mm Coating: 3, Display materials SS304 stainless, Body materials co2 metalAdditional type of body shaker displayGN Solids Manage keeps growing as well as gets to become recognized through the customers, all of us perform produce additional dimension associated with body shaker display according to buyyers ask for. know more about gnsolidsamerica  Contact  here :

drilling mud system-2

http://www.ehow.com/facts_7964827_mud-system-works-oil-rig.html

 

GN Solids America-Drilling Waste Management Company

GN Solids America LLC is a subsidiary of Hebei GN Solids Control Co, Ltd. who is a leading manufacturer for solids control & drilling waste management equipment for oil gas drilling, coal bed methane drilling, underground construction, and dredging slurry separation.

Since over 60% of GN’s business is dedicated to the oil gas industry, and 70% of our business is for the overseas market, the parent company has made the natural choice to establish its US branch in Houston, Texas, the top oil & gas industry centers in the world in order to develop it as the primary sales & marketing center for our international business for the drilling waste management equipment

Drilling Waste Management -GN America

Drilling Waste Management -GN America

GN Solids America will establish a 30,000 square foot warehouse, along with 1000 square feet of indoor space which will stock the top selling drilling waste management equipment. We plan to have a growing team which will include, among others, sales and service engineers, managers and executives for our business in America and Canada, and develop it to cover our business operations in Latin America.

GN Vertical Cutting Dryer is one of the popular products for OBM and SBM.As the developing for the evironment regulations,the drilling waste management has become more and more import.As an international famous brand for solids control,GN has been developping products suiting for drilling waste management.Up to March,2012, GN Solids Control is the only one API Certified manufacturer who provide Vertical Cutting Dryer for drilling waste management.GN also have the H-I G Dryer Shaker,and Dewatering Centrifuges,Big Bowl Big Volume decanter centrifuge availalble for drilling waste management and solids control.

GN Solids America- Drilling Waste Management Mission Statement

GN Solids America’s mission is threefold.

  • First is to create and ensure positive image of the GN Solids Control brand in the oil & gas industry drilling waste management.
  1. Second is to provide the most cost-effective solution for drilling solids control & drilling waste management.
  1. Third is to provide fast delivery and service for our customers the US & Canada, which we hope to build a good image for quality oil & gas drilling waste management products made in China.

Benefits of cuttings dryer Online

Immediately upon receipt of there examine contents for damaged and/or
missing components. Al l decanter centrifuge is sold FOB Derrick Corporation, Buffalo, New York. The transportation company signed a bill of lading at the time of shipment to indicate that all items were present and accounted for, and all items were in good condition at the time of shipment. The transportation company assumes responsibility for the equipment from that point forward. For proper handling of your claim, immediately report any loss or damage to the transportation company. For material shortages not appearing on the bill of lading or for discrepancies between material
ordered and material received, immediately notify Derrick Corporation.
MOVING/POSITIONING THE EQUIPMENT
Derrick Vacu-Flo™ degassers are normally shipped fully assembled with the eductor strapped to the same skid. A label indicating the weight of the unit is affixed to the equipment. While the machine is still mounted on the wooden shipping skid, the unit should be transported on the ground using a forklift. After the machine is removed from the shipping skid, either a forklift or overhead-lifting device may be used.
WARNING! USE SPREADER BARS TO PREVENT DAMAGE WHEN LIFTING
THE EQUIPMENT.

The Reasons You Should Go For Desander

The first time screen installation, you should inspect the screen dimension, such as 1250±2mm, the tolerance can’t over it. After fixed rubber strip, then put screen, shelve strip from shaker back (drilling fluid input), and push wedge evenly on two sides use hammer to push or tension wedges, make two sides identical. Tension each screens subsequently.

shaker screen replacement. During operation, when screens broken or need to be replaced, get wedge out, then bring out screen, check if rubber strips are sufficient; then put new screen on shaker deck and tension it steadily. The Desander is finished.

Shaker deck angle adjustment refer to fig V. There are bracket, fixed pedestal, worm and gear lifter, up-down chasingleader, etc. When adjustment, handle wheel rotary by clockwise, Solids Control will be larger; handle wheel rotary by anti clockwise shaker deck angle will be less.

Gnsolidsamerica.com is the owner of the article on shaker screen,Desander and Solids Control.The website http://www.gnsolidsamerica.com/  and another website http://www.gnsolidsamerica.com/desander.html  is introduce the factory of america and chinese infor.

Maintenance cuttings dryer step

Forbidden to open the guards of the drum and belt, refit it after opening because of stoppage for some reason,When you open the cover to clean and maintain the cuttings dryer system , take note of protecting the nozzle of drum’s small end carefully, because the nozzle is made of hard alloy materials, it is hard and brittle, so jacking and hammering the nozzle is never allowed, and it is also forbidden to put any stick or fingers into the nozzle while the auxiliary motor is working. Even though the drum has stopped now, but the propeller is still working. Stick pulled in will damage the nozzle , and finger may be cut off,If shear pin is cut , replace it with a new one of the same specification and material. It is the best to use the shear pin provided by original manufacture. No other shear pins are. After using , flush and stop according to operational rules . Otherwise, drum or propeller may be jammed.
Make sure discharged solids can flow out of the tank smoothly, otherwise the gate may be blocked,pay attention to rigidity of the tank surface where centrifuge is mounted so as to avoid resonance,Check if main and auxiliary motor’s rotational direction is the same as arrows shows after resetting, no sand can be discharged if not.
Protect feed pipe carefully when removing and installing the centrifuge. Abrasion with the drum will occur when it is bent and it will be wear out at last,Six lunate discs are installed at the big end of the drum. Remount them back according to its series number after disconnecting, don’t exchange them so as to keep drum’s interia balance,No untrained personnel is permitted to operate the centrifuge.
1.Maintenance cuttings dryer .
There are four grease filling points in the centrifuge, two of them are at the top of the main bearing base. After every 8 hours’ running, fill No.2 lithium base grease in ,fill until excessive oil flow out. Another two filling point are at the left and right axle of the drum, fill 2# lithium base grease once every 50 hours (Each time, press grease gun for 10 times)
2.Lubricate the planetary gear box with No.68 engine oil. After the first 150 hours’ running , the engine oil should be replaced completely : First, drain off all the used oil , then fill in 4kg of diesel oil, screw the plug, and then discharge the diesel oil after manually rotating the differential several turns. In the same way, flush it for 2~3 times , finally, fill No.68 engine oil to the required level.
From now on, after every 1000 hours’ running , replace the oil according to the procedures described above .
3.No.20 or No.6 hydraulic transmission oil is normally used for filling into the hydraulic coupler . the oil in the coupler not only have the function of lubrication, but also as a media of transferring torque. The amount of oil feed directly affect the capacity of torque transmission. Max. oil feed shouldn’t exceed 80% of the total volume, otherwise coupler isn’t effective in buffering motor’s starting impact, then lead to pressure rising in the couple cavity while it is running, increase hydraulic loss, leakage and heat may occur; Min. oil feed can’t less than 50% of the total volume, otherwise, bearing can’t be fully lubricated, speed the wear of the bearing, at the same time, noise occur. replace the oil in the coupler after 3000 hours’ running . The oil filled must be filtrated by 80~100 strainer screen in order to keep debris out.

operate the cuttings dryer system after long time off status

If we operate the cuttings dryer system after long time off status, we need to inspect motor rotary unit on insulation. Use 500V Ω gauge, get resistance is not larger than 0.5MSZ, we can run the shaker

Notice: ① If the motor doesn’t run at all, we must shut off the power immediately to avoid motor broken
② After starting motor, to inspect, whether this is any problem. If there is any break off or uncommon noise. If two motors are not running in-phase we need to stop the motors and get rid of problems then turn it on again for operation
③ When motor is under cold status, should not be started 5 times continuously; when motor is turned off under hot status, the restart can not be over 3 times continuously
Shaker screen maintenance
① Before every shut off, the shaker should run without any medium for 5-10 minutes, at the same time, use clean water to flush screen clean
② Every time finish operation, the shaker frame and screen should be flushed by water (summer) or steam (winter), there should be not much sediment on shaker frame and shaker screen. Especially when the drilling mud has large viscosity and high density or screen is finer than 60 mesh. Otherwise, the particles and fine sand on screen will block screen hole, when we start shale shaker, it will decrease filtration result and lead drilling mud flow away, lose much unnecessary cost.
cuttings dryer maintenance
Electric control cabinet is explosion proof magnetic starter, the electric principle is as fig VI, if there is any trouble we must shut off the power, and repaired by electrician or specific person
Spare parts for GNPS752
No. Name Model Unit Qty Remark
l Vibration motor MVE2400/15D Set 1 1.0kW
2 Vibration motor MVE1100/15D Set 1 0.4kW
3 Shaker screen 750×900mm PC 2 40/20目
4 Tension wedge PC 4
5 Spring PC 4
6 Damping horizontal strip PC 4
7 Damping vertical strip PC 4
8 Enclosed files for GNPS752
9 GNPS752 Shale shaker user manual 1 set
10 GNPS752 Quality certificate on shale shaker 1 set
Resource Box :
The author of the article recommends,if need pls contact us

Gnsolidsamerica company produces high cost shale shaker

This section contains a summary of WARNINGS. The ZCQ Degasser has been designed to perform the stated functions safely.

All persons responsible for operation and maintenance of this equipment must read and understand all safety information in this manual prior to operating and/or maintaining the equipment. The safety warnings listed below are included in applicable procedures throughout this manual.

This section describes the recommended installation procedure for the ZCQ270/360 Vacuum Degasser. Instructions include site preparation, equipment leveling, feed

and discharge connections, and electrical connections.

Gnsolidsamerica.com is the owner of the article on shale shaker screen  and shale shaker , pls click gnsolidsamerica to know more info,pls visit us http://www.gnsolidsamerica.com/linear-motion-shale-shaker.html