The Reasons You Should Go For Desander

The first time screen installation, you should inspect the screen dimension, such as 1250±2mm, the tolerance can’t over it. After fixed rubber strip, then put screen, shelve strip from shaker back (drilling fluid input), and push wedge evenly on two sides use hammer to push or tension wedges, make two sides identical. Tension each screens subsequently.

shaker screen replacement. During operation, when screens broken or need to be replaced, get wedge out, then bring out screen, check if rubber strips are sufficient; then put new screen on shaker deck and tension it steadily. The Desander is finished.

Shaker deck angle adjustment refer to fig V. There are bracket, fixed pedestal, worm and gear lifter, up-down chasingleader, etc. When adjustment, handle wheel rotary by clockwise, Solids Control will be larger; handle wheel rotary by anti clockwise shaker deck angle will be less.

Gnsolidsamerica.com is the owner of the article on shaker screen,Desander and Solids Control.The website http://www.gnsolidsamerica.com/  and another website http://www.gnsolidsamerica.com/desander.html  is introduce the factory of america and chinese infor.

Leave a Reply

Your email address will not be published. Required fields are marked *